Free guide
Six settle plate mistakes that undermine your EM data
What goes wrong with passive air monitoring, and what good looks like. An 11-page practical guide with a desiccation decision tree and a self-audit checklist.
The six mistakes
For each one: what goes wrong, what good looks like, what to put in your SOP, and one question to ask of your own programme. Plus a desiccation decision tree and a 25-point self-audit checklist.
- 01Using media that can’t detect what’s there
- 02Labelling the lid
- 03Placing plates where it’s convenient
- 04Over-exposing, then extrapolating
- 05Accepting dried-out plates
- 06Losing control after exposure
Written by Tamryn Hassel with Blessing Fubara.
Get the guide
Tell me where to send it. The download link appears as soon as you submit.
