CCS Effectiveness Review
Show your contamination control strategy still works
PIC/S PI 058-1, in force from 28 October 2026, expects the CCS to be reviewed on an ongoing basis, and at least once a year. We review your CCS and the last 12 months of data, and tell you what is working, what is not, and what to fix first.
What the review looks at
Most CCSs in smaller companies were written to meet the Annex 1 deadline. Few have a method for showing they still work. We look at four things:
- ✓Structure. Can each element be found, owned, measured and reviewed?
- ✓The review triggers. Do management review, deviations, change control, emerging problems and PQRs actually feed back into the strategy?
- ✓The Annex 1 elements. What does 12 months of evidence say about whether each control is working?
- ✓The limits. Does your CCS state its blind spots and residual risks, and has anyone independent challenged it?
Not for you if you do not have a CCS yet. Start with a Readiness Review or our consultancy instead. It suits non-sterile sites too, where the same contamination control principles apply.
Remote review
From £2,950
Plus VAT where applicable.
With a site visit from £4,950.
Annual repeat £2,450 when booked within 12 months.
- ✓Your CCS reviewed against PI 058-1 and Annex 1
- ✓12 months of monitoring, deviation and change data checked against the strategy
- ✓Written report with a prioritised action plan
- ✓Independent challenge, which is hard to give yourself
- ✓60-minute debrief call to walk through the findings
Prices cover one site and up to two cleanroom suites or filling lines. Larger sites are quoted.
How it works
01
Kick-off call
60 minutes with whoever owns your CCS, to agree scope and dates.
02
You send the evidence
The documents and data below, shared however suits you.
03
We review
About three days of consultant time, or four and a half with a site visit.
04
Report and debrief
A written report with a prioritised action plan, and a call to walk through it.
What we need from you
If you cannot find some of this, that is a finding in itself, and a useful one.
- The strategyYour CCS and any annexes, its index of elements and owners, the risk assessments behind it, and your review procedure if you have one.
- The siteFacility layout with cleanroom grades; people, material and waste flows; products and processes; organisation chart.
- MonitoringYour EM programme, sampling plan and how limits were set; 12 months of EM trends; water, gas and steam data; personnel monitoring; organism identifications.
- What went wrong12 months of deviations, excursions, OOS results and CAPAs, showing which were assessed against the CCS.
- ChangeThe change control log for the same 12 months.
- Review evidenceManagement review minutes, the CCS sections of your product quality reviews, and any earlier CCS reviews.
- ControlsCleaning and disinfection programme and efficacy data, cleaning validation summary, APS status, qualification status of HVAC, cleanrooms, equipment and isolators or RABS, and overdue maintenance.
- PeopleGowning qualification and training status.
- SuppliersCritical suppliers, contract labs and their technical agreements.
- HistoryPrevious inspection or audit findings related to contamination control.
Not ready to book?
Score your own CCS first with our free checklist. It takes about an hour.
